Send me a FREE trial issue Plus a FREE gift
Old-House Online » Old-House Tips, Restoration Stories, & More » Repairs & How To » How To Keep Projects Under Control

How To Keep Projects Under Control

A professional carpenter shares his secrets for keeping the mushroom factor in check on old-house projects. By Mark Clement | Photos by Theresa Coleman

    Before the new door could be hung, pantry shelves attached to the casing had to be removed.

    Before the new door could be hung, pantry shelves attached to the casing had to be removed.

    As a professional carpenter, I have lots of tricks up my sleeve when working on projects. For example, before I dismantle a door opening, I examine the lay of the land—the door, whatever it shares a wall with, and any doors and windows nearby. That’s because in old houses, one thing is often connected to another—this door was a good example of how projects can mushroom out of control if you don’t think them through (and sometimes even if you do!).

    My initial survey lets me work out an order of operation and set reasonable expectations for how complicated (and how messy) the job will be. All of this means that when you reach for your flat bar and hammer for the initial demo, you should also be ready with every other tool you in your arsenal, because you will probably need it. In the case of our door move, we had to deal with the following extras:

    -Pantry shelves behind the basement door toe-nailed into the door’s casing. This meant that all of the shelves (and everything on them) had to go.

    -The cellar door abutted the adjacent hallway/living room opening, which meant we had to figure out how to trim both openings together in a way complementary to the house, while keeping them level with the trim inside the living room (the backside of the adjacent opening).

    -Doorbell wiring running along the casing behind the basement door (needed electrical work).

    -The hall floor—we knew we would replace it down the road. Knowing this, I chose to remove the 1970s linoleum beneath the jambs and replace it with header strips the same thickness as the new flooring (a task requiring my circular and reciprocating saws).

    Published in: Old-House Journal September/October 2009



    Get your FREE Trial Issue of Old House Journal and 2 FREE gifts.
    Yes! Please send me a FREE trial issue of Old House Journal and 2 FREE gifts.
    If I like it and decide to continue, I'll get 7 more issues (8 in all) for just $24.95, a savings of 48%. If for any reason I decide not to continue,
    I'll write cancel on the invoice and owe nothing. The Free Trial Issue is mine to keep, no matter what.
     
     Full Name:
     Address 1:
     Address 2:
     City:
     State:
     Zip Code:
     Email (req):
     
    Offer valid in US only.
    Click here for Canada or here for international subscriptions

    Products & ServicesHouse ToursHistoric PlacesHouse StylesOldHouseOnline.comMagazine
    Architectual ElementsKitchen & BathsHistoric HotelsArchitectural TermsRepairs & How ToSubscribe to Old-House Journal
    BathsInterior & DécorHistoric NeighborhoodsAmerican FoursquareFree NewslettersBack Issues
    Ceilings & WallsGardens & ExteriorsHouse MuseumsBungalowSubscribe to Arts & Crafts HomesDigital Editions
    Doors & WindowsColonial RevivalOld House CommunityAdvertise
    Exterior Products & LandscapeGothicAbout Us 
    FlooringQueen AnneContact Us 
    FurnitureVictorianPrivacy Policy
    HardwareLand for Sale
    Heating & CoolingSite Map
    Home Décor
    Kitchens
    Period Lighting
    Real Estate
    Repair & Restoration
    Roofing & Siding
    Tools & Equipment

    EXPLORE OUR HOME GROUP BRANDS:
     
    Designer Sourcw e bookHistoric Home Show Logo

    Copyright © 2011-2016 Old House Online